ANALISIS KINERJA PROYEK PEMBANGUNAN RUMAH SAKIT PANTI BHAKTININGSIH CHARITAS KECAMATAN BELITANG, KABUPATEN OKU TIMUR
Keywords:
Performance, time and cost saving, Earned Value AnalysisAbstract
In a project, planning and controlling time and cost is parts of contruction management project completely, Earned Value concept is one of method that can monitoring project’s performance from the cost and time goodly. This research has aim to know project’s performance from the time and cost side weekly, predict cost and time for job finishing rest of jobs. So it can get correction action what next will do for project developing. It use Earned Value Analisys by collecting data in the field development project Panti Bhaktiningsih Charitas Belitang Hospital. The results of the analysis of the Panti Bhaktiningsih Charitas Belitang Hospital construction project, namely the actual cost to complete the Panti Bhaktiningsih Charitas Belitang Hospital construction project from May 2017 to July 2018 was Rp. 19,883,148,800 with a Schedule Performance Index (SPI) value of 0.887 while the Cost Performance Index (CPI) was 1.034, which means that the project experienced delays in terms of schedule but incurred actual costs that were less than the work that had been carried out. Estimate to Completion (ETC) value is Rp. 7.333.436.666 and Estimate Cost at Completion (EAC) value is Rp.27.216.585.466,00 whereas Estimated Completion Date (ECD) value become 558 days from finishing the project.
References
Ariana, I. K. A., & Lestari, D. A. (2023). Analisis kinerja proyek optimalisasi SPAM Gatak Kabupaten Sukoharjo dengan metode earned value. Journal of Integrated System, 6(1), 87-102.
Arthono, A., Rahayu, D., & Purbakawaca, R. (2024). Analisis Biaya dan Waktu dengan Menggunakan Metode Nilai Hasil (Earned Value) pada Proyek Pembangunan Mako Polres Jakarta Barat. Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil, 8(2), 309-315.
Christy, G. M., Puspasari, V. H., & Nuswantoro, W. (2023). Analisis Pengendalian Biaya dan Waktu Dengan Metode Nilai Hasil Pada Pembangunan Jalan Simpang Empat Gedung Baru Universitas Palangka Raya: Analysis of Cost and Time Control With Earned Value Method on The Construction of The Four-Way Intersection of The Palangka Raya University’s New Building. Bentang: Jurnal Teoritis Dan Terapan Bidang Rekayasa Sipil, 11(2), 209-216.
Firda, A. (2023). Produktivitas Pekerja Dengan Menggunakan Metode Work Sampling (Pekerjaan Pemasangan Tiang Pancang). Jurnal Teknik Sipil Lateral, 1(1), 15-25.
Janizar, S. (2023). Penerapan Metode Earned Value Analysis Terhadap Waktu Penjadwalan: Studi Kasus: Pembangunan Gedung Ruang Kelas Baru (RKB) Pada Madrasah Aliyah Negeri (MAN) Kab. Karawang. Jurnal Konstruksi, 21(1), 113-120.
Jurnal, R. T. (2018). Penerapan Value Engineering Pada Pekerjaan Konstruksi Studi Kasus Proyek Pembangunan Rumah Sakit Umum Provinsi Sumatera Selatan: Ani Firda, Sandi Saputra. In Forum Mekanika (Vol. 7, No. 2, pp. 78-86).
Lasmita, R., & Ardeline, M. (2024). Earned Value Analysis Terhadap Waktu dan Biaya Pada Proyek Pembangunan Gedung Pasar Padang Panjang. Jurnal Kendali Teknik dan Sains, 2(3), 221-238.
Moerdiwanto, M. F., & Zuhdy, A. Y. (2023). Analisa Perhitungan Waktu dan Biaya pada Proyek Pembangunan Gedung DPRD Balai Pemuda Surabaya dengan Metode Earned Value Management. Jurnal Teknik ITS, 12(1), D15-D21.
Nurtsani, R. A., Septiadi, D. R., & Suharyanto, S. (2017). Pengendalian Biaya Dan Waktu Proyek Dengan Metode Konsep Nilai Hasil (Earned Value). Jurnal Karya Teknik Sipil, 6(4), 460-470.
Pabalik, C. P., Walangitan, D. R., & Pratasis, P. A. (2018). Analisis Nilai Hasil Terhadap Waktu Pada Proyek Konstruksi. (Studi Kasus: Pembangunan Gedung Laboratorium Fakultas Teknik Universitas Sam Ratulangi). Jurnal Sipil Statik, 6(11).
Rumere, E. Y., Tjakra, J., & Ingkiriwang, R. L. (2019). Konsep Nilai Hasil Terhadap Waktu Dan Biaya Pada Pekerjaan Proyek Pembangunan Rumah Postulat Ursulin Ende Nusa Tenggara Timur. TEKNO, 17(73).
Septriansyah, V., Umari, Z. F., Wartini, W., Akhirini, A., & Anugerah, R. (2024). ANALISIS KINERJA BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN JALAN AKSES BUMI PERKEMAHAN GANDUS DENGAN METODE EARNED VALUE. Jurnal Teknik Sipil LATERAL, 2(1), 9-18.
Soeharto, Iman, 1995, Management proyek : dari konseptual sampai opersional, Jakarta : Erlangga Soeharto, Iman 1995, Management Proyek : dari konseptual sampai opersional, Jakarta : Erlangga, Edisi kedua.