ANALISIS PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN TANAH PROYEK NORMALISASI DANAU DI DANAU ULAK LIA KECAMATAN SEKAYU
DOI:
https://doi.org/10.52333/lateral.v3i2.593Keywords:
Lake Normalization, Earthwork, Heavy Equipment ProductivityAbstract
Lake Normalization is a job that aims to improve the structure of the lake shape by moving sedimentation in the lake so that the lake volume increases and can accommodate more water capacity. Lake normalization work uses excavator heavy equipment with hitachi and sumitomo brands. The purpose of this study is to determine the productivity of excavator heavy equipment using the analysis method of PERMEN PUPR No. 28/PRT/M/2016 and determine the number of heavy equipment needed in lake normalization work. Based on the results of the analysis that has been done, it is known that the volume of the lake is 98,350 m³ with hourly productivity of hitachi brand heavy equipment 93.72 m³ / hour and productivity of sumitomo brand heavy equipment 84.35 m³ / hour and the heavy equipment needed in lake normalization work is 10 units consisting of 5 units of hitachi brand excavators and 5 units of sumitomo brand excavators.
References
Alifen, Ratna S. (2012). Diktat Teknik Pelaksanaan dan Peralatan, Universitas Kristen Petra.
Erivianto, W . I. (2002). Manajemen Proyek Konstruksi, Penerbit Andi, Yogyakarta.
F. Saputra (2018), “Kajian Produktivitas Alat Muat dan Alat Angkut pada Pengupasan Overburden di PIT S5 Selatan,” Indonesian Mining and Energy Journal, pp. 29 -39
Ilahi, R.R., Eddy I. & Fuad R.S.. (2014). Kajian Teknis Produktivitas Alat Gali Muat (Excavator) Dan Alat Angkut (Dumptruck) Pada Pengupasan Tanah Penutup Bulan September 2013 Di Pit 3 Banko Barat PT. Bukit Asam (Persero) Tbk. UPTE. Universitas Sriwijaya: Indralaya.
Kerzner.(2006), Panduan Aplikasi Proyek Konstruksi, Yudhistira, Jakarta.
Kholil, A. (2012). Alat Berat. PT Remaja Rosdakarya. Bandung.
Lydianingtias and Suhariyanto, (2018) Alat Berat, POLINEMA PRESS
Nunnally, S.W. (2007). Construction Methods and Management, Seventh Edition. Prentice Hall, Inc.
Permen No.28 PRT/M/2016 . Analisis Harga Satuan Perkerjaan.
Peurifoy, R.L. (2006). Construction, Planning,Equipment, and Methods, SeventhBEdition. Mc Graw Hill, Inc.
R. Anisari, (2016) Produktivitas Alat Muat Dan Angkut Pada Pengupasan Lapisan Tanah Penutup Di Pit 8 Fleet D Pt. Jhonlin Baratama Jobsite Satui Kalimantan Selatan
Rostiyanti, F, S. Ir, (2002). Alat Berat untuk Proyek Konstruksi. Rineka Cipta. Jakarta.
Tenriajeng, A. T. (2003). Pemindahan Tanah Mekanis. Jakarta: Gunadarma.
Wilopo, Djoko., (2011). Metode Konstruksi Dan Alat-Alat Berat. Penerbit Universitas Indonesia (UI press). Jakarta.
Yanto Indonesianto, (2005), ”Pemindahan Tanah Mekanis”,UPN “ Veteran”Yogyakarta